The scope of this project was to provide the engineering and procurement for a new transformer overload sectionalizing scheme.
Protection & Control
Protection & Control
The design and engineering for primary and secondary isolation between a Utility Company’s System and the Generating Facilities owned by an independent operator.
The Substation Automation & Distribution Projects consisted of 8 distribution substations on a clients’ Electrical System.
Protection & Control
Protection & Control
As part of two separate 300 Megawatt 345kV Transmission Interconnection Wind Farm Projects, QualiTECH Engineering performed the following design at twenty different locations.
Protection & Control
The scope of this project was to install a new 345kV position onto a ring bus to accommodate for a new 345kV two-terminal line between two Utility Companies.
Protection & Control
The scope of this project was to install a new 34.5kV position onto a single bus to accommodate for a new 34.5kV two terminal line between two Utility Companies.