The scope of this project was to provide the engineering and procurement for a new transformer overload sectionalizing scheme.
The design and engineering for primary and secondary isolation between a Utility Company’s System and the Generating Facilities owned by an independent operator.
The Substation Automation & Distribution Projects consisted of 8 distribution substations on a clients’ Electrical System.
As part of two separate 300 Megawatt 345kV Transmission Interconnection Wind Farm Projects, QualiTECH Engineering performed the following design at twenty different locations.
The scope of this project was to install a new 345kV position onto a ring bus to accommodate for a new 345kV two-terminal line between two Utility Companies.
The scope of this project was to install a new 34.5kV position onto a single bus to accommodate for a new 34.5kV two terminal line between two Utility Companies.